Showing posts with label Lamb's Pride. Show all posts
Showing posts with label Lamb's Pride. Show all posts

16 February 2013

Delayed Gratification

Look, Ma!  Two sleeves!

The saga of the Minimalist Cardigan ended happily.  Thanks to a wonderful knitter I found on Ravelry, I was able to purchase another skein of yarn and the dye lot was a good match for what I already had.  I knit up the sleeve, sewed everything back up (in the process of making sure things matched, I discovered that I'd sewn on Sleeve A inside-out, so I had to take it off and do it again.  Sigh.)

I haven't bothered to block it yet, but that hasn't stopped me from wearing it.  Much.  I really do need to block it, though.  I just... well, I moved to Connecticut about two weeks ago, and that takes some time and energy, y'know?  And then I had some computer issues and couldn't update, but that got fixed.

Here are a couple of action shots before a meeting at church just before I left.  I probably shouldn't have worn this sweater with this dress, but I was so excited about wearing each item that I didn't really care if they actually went together.  It turns out they don't, but I didn't know it until I saw these photos.  Oh well, it is what it is.


Oh, and I haven't left-left my church, I'm on sabbatical.  It's wonderful so far.  I do miss home and think about my friends and church people quite often, but it's been nice to live with Husband and know it's for three whole months rather than just a week or two. (Being married to a grad student is hard.)  So far I've gotten my hair dyed, sat through a blizzard and watched lots of people drive like idiots in the snow, spent a couple of days in New York City (watched some Fashion Week nonsense and a dress rehearsal of Parsifal at the Met; both were great), and seen a lot of theater.

And yeah, I've done a bit of knitting, too.  Watch for updates.

18 January 2013

Minimalist Update: Plan C

Plan C worked!!!  I purchased one skein of Bulldog Blue from a lovely and sympathetic Raveler in Massachusetts, and that skein arrived this afternoon!  It matches! (It's Lamb's Pride, and their colors tend to be pretty true, so I wasn't too worried but you never can know--there could have been some fading or something.)

My next update on the Minimalist Cardigan will come when the sweater doesn't look like this anymore.  Meanwhile, I'll post happier things, like today's earlier update.

Fireside Details

It occurs to me that the only picture of the finished(ish) Fireside Sweater that I've put on here was from relatively far away.  Here's a closer picture, although it's from before I put on the buttons.



And I neglected to post pictures of the fabulous back cables that I totally made up all by myself.  So here you go.














Here's a close-up of the upper back cable and the fabulous Kitchenered-cable neck.

13 January 2013

The Saddest (Knitting) Story Ever in the Entire Universe

YOU GUYS.  The worst thing ever has happened.  (Well, there are worse things in general, but the worst knitting-thing.)  It's terrible.  Perhaps the worst knitting-thing ever to happen in the whole history of bad knitting-things.  I will burst into tears any minute now.

The Minimalist Cardigan is not nearly as finished as it appears in this picture.
Far from it.



Listen, children, to a long and harrowing tale:

I woke up New Years Day all filled with inspiration to Accomplish Something.  Seems like a good way to start the year, no?  So I dug out the long-marinating Minimalist Cardigan, which I've been threatening to finish for at least six months.

Longtime readers mayyyy recall that the Minimalist  Cardigan was on hold for two reasons: first, that I'd run out of yarn and couldn't find the same dye lot anywhere.  I eventually broke down (February of 2011) and bought a skein of a different dye lot.  The second reason (encountered in March of 2010) was a problem with the neck not matching the shoulders.  I really couldn't decide what to do, so I just waited until I was ready to figure it out.

On January 1, 2013, I woke up with my decision: take out the pleated shoulder seam, undo the Kitchener stitch on the neck, add a few inches and reattach the back.  Did it all in one day.  Just a few hours, really.  It was lovely, and gave me new energy for the whole project.

Now that's some beautiful grafting work,
if I do say so myself.

I was being meticulous.  I even took pictures of my measurements just in case I needed them later.

Also, I got a digital kitchen scale for Christmas, so I had to make sure it was working properly.  (So excited.)


The sleeves were the next problem to tackle.  At some point, I lost track of what needles I'd been using.  The sleeves were held on straight aluminum needles that I stole borrowed appropriated from my mom years and years ago.  But are those the needles I used to make the sweater in the first place?  I have no idea.  After all, it's been at least three years since I *stopped* working on this sweater.  I had one sleeve knitted up, but needed to do the other -- and if I was working on unknown needles 3 years ago, how in the world was I to get the same exact gauge on the second sleeve, no matter what needles I used?  No, both sleeves needed to be knit with the same needles so they'd match each other, even if they didn't exactly match the body of the sweater.  The finished sleeve would have to be re-knit.

So I did re-knit it.  But I neglected to un-kink the yarn properly (or, um, at all) before I did it.  That was dumb, and the sleeve looked bad enough that I wasn't confident it would re-block properly.  I didn't even photograph it.

I had some traveling to do -- a week-long conference of sorts for professional development.  Perfect for knitting and re-knitting sleeves.  Brought the sweater body, plus the finished-but-to-be-re-redone sleeve and the skein for the second sleeve.  First two days of the conference, I knit up the second sleeve using the aluminum straights.  Then I unraveled the first sleeve and properly straightened the yarn in the hotel shower using the wonderfully-heavy ice bucket for weight.  I was fortunate to have a tolerant conference roommate, who happens to take baths.

Then I re-reknit the darn first sleeve.  I finished right at the end of the day Friday (our last day there) and had managed to get most of the side-seaming done here and there.  All that was left to do was sew in the sleeves.

I sewed in Sleeve A (because once they're both off the needles, who knows which is the first sleeve, which I knit three times, and which is the second sleeve, which I knit only once?) on the first plane home this morning.  The flight was the exact right length to get it done.  The most beautiful seaming I've ever done, frankly.  I really should take a picture of the underarm seam, 'cause it's a thing of beauty.

AND THEN I LEFT SLEEVE B ON THE FIRST PLANE.  I think it must have fallen down between my seat and the window-wall, or maybe even slipped off the armrest to the row behind mine when I stood up.  I'd even looked back in my row to make sure I didn't leave anything as I was getting off the plane.  I didn't discover the loss until I was on plane #2 an hour later, when I'd settled into my new seat so I could start sewing in Sleeve B while waiting for takeoff.

That's right.  Sleeve B is gone.

Fortunately my flight had a minor problem and was delayed just enough for me to report the loss.  I filled out a lost article form online and called the airline to talk with an actual person, who was very helpful.  Unfortunately, plane#1 was already on its way to Los Angeles.  I was in Washington DC.  That's incredibly not helpful.  Just a few minutes after I learned this information, my plane departed for Connecticut.  The official story from the airline is that the flight crew reports all lost articles at the end of the day.  Tomorrow the computer system will kick in and match the crew's lost article report with my lost article form--if the crew did indeed find Sleeve B and didn't throw it away.
Photo taken in Hartford.  The sweater looks really good,
except for the missing sleeve.
The blue sweater makes my outfit look silly, though.
I swear it looked great when I was
doing the monochromatic thing.

I'll get a phone call tomorrow if Sleeve B has been found.  If it hasn't... well, that's that.

Relatively quickly, I came up with a back-up plan.  I'd flown in to Hartford and was driving back to Burlington right away, and the route goes right past WEBS, pretty much the biggest yarn store in the country.  That's where I bought the extra skein back in 2011 in the first place.  They're open till 5:30 on Saturdays, and I had plenty of time to get there.  I called them to ask them to set aside a skein of Bulldog Blue for me.  The helpful woman on the phone looked in the computer... no Bulldog Blue on hand.  Would I like them to order it for me?  It'll come in in a few weeks.

No problem, I said, a few weeks will be fine.  (And if the airline does find Sleeve B, I will cancel the order.)  She checked the Brown Sheep website to be sure...

And the color is discontinued.  They can't order it for me.  Nobody can order it for me.  There is no more Bulldog Blue available for purchase.  

There is one person on Ravelry who has this colorway in their stash and is willing to sell it.  If I don't get a phone call from the airline tomorrow, you better believe I am contacting this Raveler.

Please, send as many prayers and vibes and whatnot into the universe as you possibly can.  So far mine kind of look like this:

Please, God, let the airline find Sleeve B and mail it back to me.  I can't promise You that I will never again take four years to finish a sweater, but I can promise you that I have learned some sort of lesson from this experience and when I figure out what it is I will remember it forever. Love, Holyknitter.  Amen.

I feel confident that God understands what I mean here.

27 November 2012

Finished Fireside

So here it is, the Fireside Cardigan.  Done!  I’m thrilled with the end result.  It did grow a bit when I blocked it – the arms needed some coaxing not to be eleventy-zillion feet long when I put it on after it had dried – but the fit is still quite good in spite of the growth.  I’ve also lost some weight since I started the knitting back in January.  If I’d known I was going to do that, I’d maybe have knit the small instead of the medium.  But still.  I’m quite pleased with it.  I looooove the color, and I swear this one is even better than the original model that Cameron Diaz wore in The Holiday.  (Many thanks to Portcat for finding a still I could use!)

I wasn’t sure I would like the double-breasted look on me, but it turns out I love the cozy wrappy-ness of this sweater (would it be crazy to knit a cable-y belt??).  My one regret is that I only made five buttonholes.  I should have done seven so I could close it higher up the neck.  Maybe I’ll add a few loops instead.

Mods:
It must be said that I modified the pattern quite heavily.

  • First, I knit the body in one piece instead of in three.
  • Then, I added cables on the sides where the side-seams would have been.  I just wasn’t interested in looking at that much reverse stockinette.
  • In the interest of avoiding giant panels of reverse stockinette, I also added cables in the center back, at both the bottom and the top.  So much prettier.
  • I knit a sort of fake i-cord thingy on the front edges – a slip-stitch selvedge, three stitches wide.  I think.
  • The above changes mean that I didn’t use the original stitch count the pattern wanted.  But I think I ended up with the required number of stitches after I split for the arm holes.
  • I may or may not have followed the pattern’s waist shaping instructions.  But, y’know, I made it to fit my body, not the author’s.
  • Same sleeve modification that everyone else did, so I didn’t get a too-short sleeve cap.
  • I kitchenered the shoulder seams and neck, rather than do the 3-needle bind-off.  Less bulky, more elegant.  (Pic to the right, above)
  • There was something else with the sleeves – I don’t remember what the pattern said to do, but I held twelve underarm stitches on the sleeves (and twelve on the body) and kitchenered them together.  Turns out, I kind of like kitchenering.  And I’m pretty good at it now!
  • I did five buttonholes, including one at the bottom.  Seriously, what is up with making sweaters that don’t close at the bottom?  I don’t always button the bottom button on my sweaters, but I want the option.  Anyway, my sweater has a button at the bottom – and like I said, I wish I’d added a couple more buttonholes higher up the chest so I could have seven buttons instead of five.
  • Oh, the rope cables that are supposed to stop cabling at the sleeves?  I kept cabling them, and left a selvedge stitch for seaming.  Also I kept the front rope cables (the ones that are supposed to disappear) going longer than the pattern says.  Why decrease on the cable itself when you can decrease around the cable instead?
I…think that’s it for mods.

I’m going to go be cozy in my new sweater now.  I think that might involve hot chocolate.



(This photo was taken pre-blocking, and held closed with yarn ties through the buttonholes.  This is the basement of Husband's school.  The outside of the building does not look institutional or basementy at all.  But...yeah, the basement sure does.)

06 July 2012

Intro to Fireside

A couple of friends and I decided this spring to do a cabled sweater as a knit-along.  Not a big deal, nothing formal, just a "hey, let's each knit the same sweater pattern and see how the finished products come out different" experiment.  I'm not quite sure how we settled on the Fireside Sweater (Rav link), because I came late to this game, but I appreciated not having to participate in a lengthy deliberation process.  All I had to do was grab some Lamb's Pride Worsted from my stash and get to work.

Fireside is a gorgeous cabled concoction with a sumptuous collar.  Turns out, though, that the pattern's a bit of a mess.  It's just not very well-written (it's clearly-written, but not well-thought-out in a few places) and I'm very glad that I spent a good bit of time on Ravelry reading about the ways other knitters had modified the pattern.  For one thing, this is the designer's first pattern.  Or first sweater pattern, maybe.  Anyway, there's a hint of not-knowing-what-she's-doing to it.

This not-knowing-what-she's-doing is most clear in the way she has written the upsizing: the designer happens to fit a size XS, and she made the sweater for herself... but her solution to upsizing was to add extra inches of reverse-stockinette between cables and cable-panels.  So for those of us who are not size XS, the extra "empty" space simply makes the cabling look sparse -- so the bigger you are, the farther-apart the panels are... that is, the wider you are, the wider you look.  (And seriously?  I'm knitting a size medium.  I can't imagine how an XL sweater would look, but it seems like there'd be more reverse-stockinette than cables.)  This is particularly an issue for the back of the sweater, which has a giant swath of rev-st that's just supposed to get wider the wider you are.  Not flattering!  It looks like everyone who's bigger than an XS has modified the sweater somehow to deal with this issue.  Most of the good mods I've seen are either additions of cables in the places that called for wide swaths of reverse-stockinette, or an increase in the size of the original cable panels.  I'm doing the former, adding cables in the center back and on the sides.

I added this cable in the center back at the bottom.
There will be a complimentary one at the top, too, when I get that far.

I also decided to knit the sweater in one piece rather than in two front panels and a back.  I'm more likely to finish it that way.  We all know that.  So I added cables on the sides under the arms where a seam would have gone, partly to fill up the reverse-stockinette space, and partly to add some of the structure a seam would have provided.  I've got a little i-cord edging happening on the front panels, too.  It looks a little funny right now, but once I block the whole thing I think it'll work out.

So far I've got a body and two sleeves -- up to the point where I'd join them to knit a yoke and do it all in one piece, but I think I am going to sew the sleeves on as written.  I've got to knit in inch or so more of the body before attaching the sleeves and attempting to, but I wanted to get the sleeves done first so I could figure it all out, and I'm glad I did because it turns out I had to modify the sleeves even more than the body (thanks to the poorly-thought-out upsizing, if I'd knitted the sleeves as written they would have been suuuuuper wide)... and, well, I think these decisions are good fodder for a future post.  Stay tuned to find out what I decide.


26 February 2011

I Promised You Pictures


This, my friends, is the new skein of Bulldog Blue needed for my Minimalist Cardigan. It appears to match the other dye lot, so I think we're good to go. I don't even think I'm going to have to do the stripey-knitting-to-get-the-sleeves-to-match thing.

This is totally going to work. It's going to be awesome.

Now I just have to pick up the sweater and start working on it again. Easier said than done.

17 March 2010

It Really Ties the Room Together

Kiki Mariko is done!

It started small, last May...










And grew...














And grew...












And then it got too warm to knit on such a big heavy wool project for a while, and there was the whole mittens craze anyway...


And then Mango totally lapped me. She started a Kiki a couple of months ago (claiming to be inspired by me... flattery will get you, well, not everywhere, but close) and actually finished it in a timely manner. FINE. I picked up mine again during the Olympics (not as a Ravelympics project, just as a "I really have to get this done and I am watching a lot of TV anyway" project), and finished the first week of March! Woo! I knit a rug, and it didn't take me a year to do it!


And I figured that, if I didn't felt it right away, I'd let it sit there for an annoyingly long time. So I finished it on a Monday morning (unusual for me to knit during the day on Mondays, unless I'm so drained I can't do anything else) and took it to the laundromat the same day (Husband laughed when I said, "I'm going to do one load of laundry... and felt that rug." Why would he laugh, do you think?). Cut the steek and put it outside to dry (Monday happened to be a gorgeous day), did a little scissor-trimming of stray bits... and voila!

It's a rug!

If I had it to do again, I'd do a few things differently. First, I wouldn't have used the black. It doesn't look quite so bad felted, but it was jarring enough during the knitting that I stopped using it toward the end. Second, I would have made a narrower steek -- four or six stitches would have been just fine, ten is excessive. Mango pointed this out to me, and I went down to eight stitches, but the whole rest of the knitting process I kept thinking about how much yarn those ten stitches (or even eight) wasted. It could have made the rug a smidge longer, right? It probably wouldn't have made a significant difference, but still. What a waste. That was a lot of yarn in the trash when all the trimming was done. Otherwise.... I'm totally happy with the pattern, and with the finished project, and I may very well make another one sometime. Fun knit!

Also, I did ~160 stitches (plus the steek) so the finished rug would be wider than the original. Finished measurements, felted: 51" x 42" I probably need to do a smidge more felting, but for now I'm too excited to have a new rug to let uneven felting stop me from putting this baby in the yellow room! Woo! Rug!

12 March 2010

Minimalist Cardigan -- need advice

So I've been working on the Minimalist Cardigan for a shamefully long time now. The truth is, I've gotten stuck: I'm not sure I'm going to have enough yarn for the sleeves to be as long as I want them. I've put up a notice on the ISO/Destash group at Ravelry, but no one's bitten yet (I may get desperate and take a different dye lot -- Brown Sheep Lamb's Pride does tend to be pretty color-reliable from lot to lot). I have been trying to get everything done on the body, including seaming as much as I can, before actually deciding that I need to buy more yarn.

I have another issue with the cardi that is more pressing, though. After steam-blocking the fronts and back -- and kitchenering the two front pieces together* -- it appears that the back is significantly larger than the front. The pieces aren't matching up at the shoulder in any kind of logical way. There's about a three-inch difference, which seems like it's probably too much to fudge where the sleeves are set-in.

What to do? I knit and re-knit the darn back about three times, and would really prefer not to have to frog it -- but if that's what I have to do, I will. Reknitting the back so it's smaller would, after all, mean that I'd have more yarn for the sleeves, and then I wouldn't have to worry about that as much. But I also don't want to have to do any math to figure out how many stitches I should have at the top of the shoulder (um, that's why I used a pattern in the first place: someone has already done the math for me).

I could also undo the kitchener stitch seam and knit a few more inches into the neckband until it's the right size, and then re-kitchener the stitches. But I think the fronts are a good size, and I'm reluctant to do anything that would make the shoulders of the sweater bigger. I like set-in sleeves on me, not drop-shoulder sleeves. I have smallish shoulders, and if my clothes fit too big in the shoulders then you can't tell how slim and cute I really am!

So: help? What should I do?

*Funny story about that kitchener stitch. I went to first-Saturday knitting at Mango's house and spent all afternoon struggling with it. I'm generally not one of those people for whom kitchener stitch is a problem, but I just was NOT GETTING IT that day. And since the only other project I'd brought with me was also a seaming project, it wasn't like just working on something else was really going to be an option. I probably spent three hours hunched over this one seam, and when I left her house I had gotten exactly half of it done. Three hours, for two inches of decent-looking kitchener stitch and two more inches to go. UGH. I went home, finished up some things for Sunday morning, went to bed... got up Sunday, worked all day, grabbed some dinner out, came home to settle in to the Oscars red carpet show... and did the rest of the kitchener seam with no problem. The half-hour red carpet show took longer than the seaming. Sigh. There is a funny shadow in this picture, darnit, so you kind of can see where the seam is, but when you're looking at the piece itself you can't see a thing.

10 July 2009

Taking Stock

Two years ago, I went to my denomination's big national meeting. And I got a job and a sweater out of the deal.

This year, I went back (it only happens every two years) as a delegate from Vermont, which sounds very important. (And it is very important, but it mostly means that I have a 6:30 a.m. meeting every day, and a voting card.) And I was extremely busy. So busy, I didn't have time to go check out City Knitting, the yarn shop in Grand Rapids that I wanted to visit. But JerseyKnitter went!

Thankfully, I'd brought yarn. Stash yarn, in fact. A very deep navy "Bulldog Blue" from Brown Sheep (Lamb's Pride Worsted). I'm working on the Minimalist Cardigan (Rav link). I got the whole back done while I was sitting in meetings, but then discovered on the airplane home that I'd missed some decreases for the underarms -- so I had to frog 7 inches and pick up the stitches to do the decreases. Argh.

Anyway, here's me blissfully knitting away in a business meeting. More pics of the sweater later. I've now got one half of the right front panel finished, as well.

29 June 2009

Kiki Mariko

I don't quite know how it happened. I think I must have been putting myself to sleep -- I often fall asleep thinking about future knitting projects; it's much more conducive to relaxing than thinking about work -- and I decided that what our house really needs is the Kiki Mariko rug [Rav link], in the same wacky colors as we've painted the walls. Bright yellow, bright orange, bright red. Like I said, I'm not quite sure how the idea crawled its way into my head... but it made itself at home there. It may have had something to do with the fact that the house is coooooold in the winter, and a cozy wool rug may be something of a solution.

I already had two skeins of Lamb's Pride Bulky in creme from the swap, and a partial of an orange that I eventually decided was the wrong orange (ain't that always the way?), so I hied myself to Kaleidoscope to figure out what to do with this hankering to knit a ridiculously-colored fair-isle rug for my living room.

What I got did end up matching the walls perfectly, which makes me wonder: why the heck did I pick those crazy colors for my house? I like them a lot! I love my crazy-colored house! My yellow room makes me so happy! My red room is so cozy and comforting! My orange room... well, the orange looks really awesome with the red and the yellow, and I normally detest orange, but not in this case. And I do spend most of my time there, I'd say. But together? In the living room? (that's the orange one) This rug may end up being too much.

Actually, if it's horrible, or a bad size, Kiki will live in the yellow room, which is my office. There, the rug will be slightly less in the full-on pattern of traffic (and public eye), but still serve the warmth function quite nicely. I will be very appreciative on freezing February nights when I'm up writing my sermon.

I do kind of wish I'd forgone the black, or chosen brown instead -- I really had myself convinced that I needed another neutral, but now I'm not so sure it was necessary. The truth will reveal itself in the final product, after it's felted. I don't dislike it so much that I want to take the trouble of undoing all my work.

Anyway, after just a month of knitting (and the labyrinth rug has been a couple of years and I'm only halfway!) I'm pretty close to where I want to be. I think I want to knit the tube about 7' long, and I've probably got about 5' now. (My hope is that the length will be around 5 1/2 feet when its felted.) It's been a satisfyingly quick TV-knitting project, good for the end of a long day. And great for getting used to stranded knitting. I've really gotten the hang of the tension in my left hand, and my speed with two colors is almost what it is with just one. All in all, I'm feeling pretty proud of myself with this one.

27 February 2009

Labyrinth Rug Update II

This is why you get "before" pictures. I frequently forget the "before" picture, and I'm glad I remembered here. This is my Labyrinth Rug wayyyyyy back forever ago. My original blog post is from February 2008, and I claimed that I'd been working on it for months (that seems laughable to me now). I do remember driving up to Vermont from Georgia with the basket o' green yarn in the trunk of my car, so it has been at least fifteen months since I started -- eighteen or twenty, probably.

And this is the rug in early September.

I've pretty much ignored the mounting pile of green yarn next to my living room chair since then, but... well, like I said, I'm "between projects." And, of course, being "between projects" when it's Oscar time and the President's giving a not-quite-State-of-the-Union speech... well, that's what the Labyrinth Rug is for.

And I decided that, for the first time ever, really, I probably ought to measure this baby to see how far I've gotten. Up until now, I've kind of been guessing about my progress. So I got out the old sheepie measuring tape and learned that the tape itself is five feet long. (I've never bothered to pull it out all the way! I figure, if a project is big enough that you've got to measure it in feet, it's probably something you should just be estimating anyway. A blanket's a blanket, right?)

Anyway, I spread the tape on the floor and the rug beside it in lengths, and learned that it's a whopping thirty feet long! And, um, ten+ of that I've done in the past four days or so.

I marked the 30-foot point and added about two more while watching the Daily Show. Now I'll have a better visible gauge of my progress than trying to make Kitty stand next to the rug every time I want to take a photo of it. The safety pin is far less likely to get up and walk away while I'm lining up the shot.

Also, I'm getting to the point where I'm using up some of the smaller skeins of yarn. Since I'm only halfway through, I may need to reconsider some of my pacing. Then again, the point of this rug is to use the scraps, so I'm not going to sweat it. I'm only about halfway through the skein of Lamb's Pride Worsted I bought just for this project, so I'm okay with that.

I'm not entirely sure that I'm okay with going another eighteen or twenty months on this project. (A math problem: if I'm halfway through the knitting at thirty feet, and it took me twenty months to get there, what is the probability that I will poke my own eyes out before I finish this rug. And not for not liking it. I still like this rug, even after twenty months of knitting and only half a rug to show for it.) What I'm saying is, I may need to step it up a bit.