Showing posts with label superwash. Show all posts
Showing posts with label superwash. Show all posts

27 July 2011

Adventures in Blocking on the Road

My friend LiturgyGeek had a baby. A daughter. BabyLG, we can call her. She was born a few months ago now, but I didn't rush to make her something because I knew I wanted to make a baby sweater for her -- and, well, she was born at Easter. She lives in Iowa and won't need a baby sweater until the fall. A six-month size sweater will be perfect for her. And I knew I would see her Mama in July. Sooooo I didn't rush to get anything done and in the mail.

Anyway, July is here. Seeing LiturgyGeek (and meeting BabyLG) involved a trip to Tampa, Florida (not because they live there, but because the United Church of Christ national meeting was there, and LG and I both had to attend). About a week before take-off, I put down the sweater I'm making for Husband, found a pattern I liked, and bought some yarn.

Side note: can I just take a moment to say how excited I am that Malabrigo is making a superwash worsted now? I'm surely the last person on the planet to have discovered this, but DUDE. Rios is an amazing yarn. I am totally smitten. I would use it for non-baby projects! I would make big-person-sized sweaters out of it! Hooray for gorgeous kettle-dyed superwash wool!

Okay. So I bought the Malabrigo Rios -- two skeins, just in case, but it turns out that I only needed one -- and cast on and had the body, like, a third of the way done by that evening. I knitted on the plane to Florida, I knitted in meetings whenever I could... At one point, LG said to me, "by the way, I haven't seen you knitting here! Are you working on anything? What are you making?" And I got a little cagey. I think I said something like, "Yeah, I'm working on something. I'll, uh, show you later." She got it, and did not push. This is the sign of a good friend-of-a-knitter.

Anyway, I finally finished the sweater about 3 or 4 days in to the meeting. And it totally needed to be blocked. Fortunately, I was staying in a fabulous Embassy Suites suite, and was therefore well-supplied with both space and tools. I pulled out the ironing board and iron, grabbed a washcloth, and went to town with a bit of washcloth-steam blocking. It's a sweet little sweater, but those leaves on the front don't stay flat on their own! (LG, now that the sweater is blocked, you shouldn't have to worry about this again.)

Also, I accidentally dyed the washcloth purple. Sorry, Embassy Suites!

It all worked out in the end. The blocking part, that is. I honestly have no idea if the hotel got the dye out of the washcloth, but I would assume they did. Hotels are generally pros at bleaching the towels.

And the finished product came out nicely. The Cascade pattern is really cute, and very simple to make. I didn't make any modifications this time, but if I were to do it again (and I might some day) I'd make a sixth leaf at the bottom of the placket instead of cutting it off at 5 for the seed-stitch band. It doesn't seem like it would be that hard to add, although I understand why the author wrote the pattern the way she did.

I added on the buttons during the business meetings on the next-to-last day of the event. We introduced electronic voting this year, and it took a bit of experimentation to get the hang of sewing on a button and pressing the clicker-thingy at the same time (in the past we just had cards to hold up, which isn't as hard because it doesn't involve the same set of fine motor skills that sewing on buttons requires). It all worked fine, and the buttons looked good AND I voted for important stuff like LGBT human rights.

Most importantly, LG and her husband Backbencher loved the sweater. And I'm sure that BabyLG will look adorable in it this fall, when it actually fits her. LG has promised to send a photo of BabyLG in the finished product when it does fit. For now, just enjoy this Jared-Flood-esque photo of the button band.

17 March 2011

Baby Surprise (it's yet another) Jacket!

Okay, so my friend I've been knitting a baby gift for is currently on an airplane, headed in my direction (well, actually, we're meeting up in Madison, WI. But I'm already there, and she's in a plane). So I can finally show you photos of what I've been making for her, since she'll be receiving her gift soon.


Surely you knew I'd be making her a BSJ, right? RIGHT? I mean, come on.

Here is BSJ #5, also known as "green is a unisex color for babies!" I'm all about gender-neutral clothing for babies anyway, and it seems like the only way you can get them these days is to make them yourself. Also, when I started knitting the sweater, we didn't know if the baby is supposed to be a boy or a girl anyway, and I don't know if they're going to find out or not. Also-also, I had some green superwash left from another baby project I was doing at the same time. And some navy blue. And seriously, what's cuter than a navy blue stripe on a baby sweater?

So the question is, can you spot the error in this sweater? Can you tell why I had to rip and redo a few inches of BSJ?









It's right there. One side of picked-up stitches came out on the wrong side. Whoops.

Also, it turns out I ran out of green yarn before the end of the sweater, so I had to get creative with my striping. Still, though. Seriously cute!

(FO photo to follow, after the Proud Mama has actually received it.)


Also yes, those are the Knitpicks Harmony Options needles. My darling Husband gave them to me for Christmas. He's the best.

19 August 2010

Owls!

My friend Amanda had a baby a couple of weeks ago. I tend to be pretty bad about knitting gifts for friends' babies, and I'd like to be better about it. I used the awesome new Ravelry search tool (Rav link), and found the Owl Baby Vest (and again), grabbed some Superwash 220 and my size 4 and 5 circulars, and knit this baby up in about 3 days.

Well, okay, it's been about 3 days so far. I'm almost done, but as of this writing, still have the ribbing around the arm holes to complete. Soon... I've got to block it and mail it before Baby G. outgrows it! It would be big on him right now -- and should be just right for a Texas winter! -- but knowing how bad I tend to be about getting things in the mail... I've got to seize the moment.

I did make a couple of minor mods in the pattern, nothing big. I put the decreases for the v-neck and armholes in one stitch on each side (so instead of p2tog, p to last 2 sts, p2tog, I did a p1, p2tog, p to last 3 sts, p2tog, p1). I also mirrored the decreases. And I thought the V-neck instructions made the V look a bit sloppy, so fudged that a little bit in order to make the V look better. And instead of 8 sts wide for the top of the shoulders, I went with 9 sts. Just a smiiiiidge more width, and the baby's head will still be able to get through the neck hole just fine.

Look! OWLS! CUTE!!!



I'm toying with the idea of outlining one of the owls in white or light blue -- some kind of contrasting color -- but don't want to buy a whole ball for just one yard. Any Burlington friends have some scraps of Superwash 22o in white or light blue?

04 September 2009

Three BSJs in One Week...

...AAAA-hahahahahaha! Yeah, that didn't work so much.

Husband and I took a long road trip the first two weeks of August. And when I say "long road trip," I don't mean New-England-long, wherein driving for three hours is "SOOO FAAAARRRRR!" No, when we take road trips, we take road trips. 2,800+ miles in thirteen days. VT-NYC-DC-ATL-DC-VT. A real road trip.

We stopped in DC twice, on the way down for several days to visit Knitting Queen and several college friends who live in the DC area, and then again on the way up because some of those same friends were having a housewarming party and it was a good chance to see even more people I haven't seen since college. And, of course, since we're all at that almost-thirty time in life, everybody's having babies. Three different couples in DC are currently pregnant or have just given birth. In fact, one of those three couples had their baby during the week of our trip.

Three babies = three Baby Surprise Jackets.

I thought it was an ambitious-but-possibly-reasonable goal to work towards making all three BSJs during the first week of our trip. And, y'know, if I didn't get one of them done in the first week, I could definitely work on it while we were in Atlanta, and then do the gifting on our way back home. Right? Right.

Right.

First BSJ (the red one) took three separate cast-on attempts, which was most of our drive through the Adirondacks. That's almost six hours right there. Of just casting on. I didn't knit in NYC nearly as much as I thought I would, and the ball of 220 Superwash got really tangled in my purse and took nearly a day to untangle and re-roll.

(I did have an enjoyable subway moment, when the two young women sitting across from me in the subway car eyed me with envy as I was knitting, and then turned their conversation to dreams of what they'd like to knit someday -- if they ever actually bothered to pick up the needles. It was quite a hilarious situation, but contributed significantly to a need-t0-unknit-a-few-rows moment, which then started the oh-crap-what-a-tangled-mess phenomenon. That's what I get for gloating.)

I finally made some good progress on the red BSJ as we drove down the Garden State Parkway to DC/Baltimore. Finished it in DC, except for the sewing-the-shoulder-seams, and promptly lost it under stuff in the back seat of the car.

The second (blue) BSJ, I cast on somewhere between DC and Durham, NC, where we spent the night with some other college friends. I did much of the casting-on and knitting-up so much better the second time around... except that I accidentally cast on 155 stitches rather than 160, and didn't realize it until I was halfway through. I was NOT frogging several days worth of my work at this point (there was still one more BSJ to go, remember!), so I just reworked the math and kept going. But the extra math meant extra thinking for every row (wait, do I increase here, or do I increase there? How many stitches am I supposed to have on each side of the marker? How big should I make that middle section whose stitches I pick up later? ARGH).

I did not finish the blue BSJ by the time we got back up to DC on the homeward stretch of our journey. I didn't even finish it by the time we got back to Vermont, because I insisted on driving the whole way from Philadelphia to Burlington (at some point, my need to be in control of the car trumped my desire to finish the darn sweater). I finished the blue BSJ about ten days after we got home, because I wanted the needles so I could get started on the sleeve of the Minimalist Cardigan -- the night before I was taking off on my next trip. I finished the knitting, but not the shoulder seams, about 1 a.m. With a 6 a.m. flight the next day. Sigh.

One more BSJ to go. I kind of can't handle it right now, though, and want to finish my Minimalist Cardigan first. Looks like I'll need to knit the third (green) one on size 8s rather than on7s, and send that one to the biggest baby of the three.

BTW, on size 7s, one BSJ takes about a ball and a half of Cascade 220 Superwash. At some point, I'll likely make a stripey fourth BSJ out of the remainders. In spite of all the pressure I put on myself to do a bunch of the same sweater again and again (which could easily lead to me hating the pattern), I still adore the BSJ and will probably make a zillion more over the course of my lifetime.