Showing posts with label Cascade 220. Show all posts
Showing posts with label Cascade 220. Show all posts

09 September 2010

Opinions?

Owl vest is done! (Actually, it was done quite a while ago, I just haven't posted until now.)

I'm not entirely sure I love the owlie outlined with duplicate stitch this way. It is starting to grow on me, though. Except that, really, I was thinking it would be kind of like the LaCoste alligator (this is for a Texas baby -- Dallas parents who now live in Austin), and I've now realized that the owls will be marching across his tummy, not his pecs. That kind of makes me love the outlining less in general. So I'm soliciting opinions. What do you think of the outlined owl? Should I take it out altogether? Should I do a different kind of stitching (I also tried chain and blanket, and they both didn't work -- duplicate is the best of what I've tried so far)? What to do?

19 August 2010

Owls!

My friend Amanda had a baby a couple of weeks ago. I tend to be pretty bad about knitting gifts for friends' babies, and I'd like to be better about it. I used the awesome new Ravelry search tool (Rav link), and found the Owl Baby Vest (and again), grabbed some Superwash 220 and my size 4 and 5 circulars, and knit this baby up in about 3 days.

Well, okay, it's been about 3 days so far. I'm almost done, but as of this writing, still have the ribbing around the arm holes to complete. Soon... I've got to block it and mail it before Baby G. outgrows it! It would be big on him right now -- and should be just right for a Texas winter! -- but knowing how bad I tend to be about getting things in the mail... I've got to seize the moment.

I did make a couple of minor mods in the pattern, nothing big. I put the decreases for the v-neck and armholes in one stitch on each side (so instead of p2tog, p to last 2 sts, p2tog, I did a p1, p2tog, p to last 3 sts, p2tog, p1). I also mirrored the decreases. And I thought the V-neck instructions made the V look a bit sloppy, so fudged that a little bit in order to make the V look better. And instead of 8 sts wide for the top of the shoulders, I went with 9 sts. Just a smiiiiidge more width, and the baby's head will still be able to get through the neck hole just fine.

Look! OWLS! CUTE!!!



I'm toying with the idea of outlining one of the owls in white or light blue -- some kind of contrasting color -- but don't want to buy a whole ball for just one yard. Any Burlington friends have some scraps of Superwash 22o in white or light blue?

28 November 2009

Mittens for Ben, take two


These are the mittens I made for my neighbor DSB. I used exactly one skein of Cascade 220, with no leftovers!


I improvised the pattern:

CO 60 sts on size 5 dpns, and double-knit in the round (look up double-knitting -- I'm not enough of an expert to explain it here, but it means you have two layers of knitted fabric) for a couple of inches.
Start increasing for thumb gusset -- first on the inside layer, and then on the outside -- and increase every other round (so, once inside, once outside, and then do a plain round once inside and once outside) until you have added 16 stitches to each layer.
Set thumb sts. aside and reconnect hand stitches to continue in the round.
Keep going until the hand is big enough to fit.
Um, decrease a few rows in there somewhere, and on your last round, do a full-on knit-purl-knit-purl to connect the two layers (so the inside layer won't come out when you pull your hand out of the mitten). I think I ended up with about 12 stitches at the end. It makes a pretty star at the top. Then run the end of the yarn through those last 12 stitches and pull tight. Weave in end.
Return thumb stitches to needles, knit the thumb until it's long enough, do a round of p2tog decreases on the inside layer, then a round of k2tog decreases on the outside layer. Do one row of kpkp like for the top of the mitten, then close off the top of the thumb. Weave in ends, and use the beginning-thumb tail to close up the hole between the thumb and the hand.

If desired, use remaining yarn to crochet a chain, and connect the chain to the wrist of each mitten. String through coat sleeves and pretend you are a four-year-old!

Watch out, because these took me a freakin' month to make. Double-knitting is soooooo sloooooowww.

Mittens for Ben

(editor's note: I wrote this post a month ago, but was having technical difficulties... photos added to next post.)

Dear Sweet Ben (DSB) lives around the corner from me. He is NOT the same Ben who lives down the street, for whom I made a pair of Dashings last year (and no, I have never seen him wear them). DSB is an alumnus of my undergrad college in Iowa, and just happened to move here a year-and-some ago to go to grad school -- and we would have never known each other, except that another neighbor, a person in his grad department, connected us. He’s good-natured and kind, and just a very nice person. We try to be good neighbors to each other – sharing garden produce, the occasional houseplant/cat-sitting, I’ll give him a ride to school (or partway) if I see him out walking in the dead of winter, etc.

DSB got mild frostbite on his fingertips last winter, carrying his groceries home from the co-op without his gloves on. I promised him I’d make gloves, and even went so far as to ask him what color his coat is and buy the appropriate yarn (basic light gray Cascade 220), but then the weather warmed up and the need was not urgent. Now that the air is getting colder in that inevitable decline toward Real Winter, I need to make good on my promise. Also, when my grandmother died last month, DSB was totally willing to care for Doc at a moment’s notice. I’m also going to bake cookies. He deserves a big thank-you from the Holyknitter household. As does his girlfriend Jamie, who also rocks equally (even though she was out of town when Grandma died, so she wasn’t around to help with the cat this time – she has in the past)(I will probably make her mittens at some point, too, but haven't done any planning for that yet).

Anyway, DSB is getting a pair of double-knitted mittens (I'm using size 5s, so they'll be nice and dense as well as double-layered! No frostbite here!), complete with feeding-through-coat-sleeves string. It’s been a loooong time since I’ve done any double-knitting, so it’s taken me a while to get the hang of it. I’m not quite sure what I’m going to do with the thumb, as double-knitting one seems like it will be a pain. Then again, I do have to increase for a gusset anyway. We’ll see what I decide.

Don't you love how I leave you in such suspense at the end of my blog posts?

04 September 2009

Three BSJs in One Week...

...AAAA-hahahahahaha! Yeah, that didn't work so much.

Husband and I took a long road trip the first two weeks of August. And when I say "long road trip," I don't mean New-England-long, wherein driving for three hours is "SOOO FAAAARRRRR!" No, when we take road trips, we take road trips. 2,800+ miles in thirteen days. VT-NYC-DC-ATL-DC-VT. A real road trip.

We stopped in DC twice, on the way down for several days to visit Knitting Queen and several college friends who live in the DC area, and then again on the way up because some of those same friends were having a housewarming party and it was a good chance to see even more people I haven't seen since college. And, of course, since we're all at that almost-thirty time in life, everybody's having babies. Three different couples in DC are currently pregnant or have just given birth. In fact, one of those three couples had their baby during the week of our trip.

Three babies = three Baby Surprise Jackets.

I thought it was an ambitious-but-possibly-reasonable goal to work towards making all three BSJs during the first week of our trip. And, y'know, if I didn't get one of them done in the first week, I could definitely work on it while we were in Atlanta, and then do the gifting on our way back home. Right? Right.

Right.

First BSJ (the red one) took three separate cast-on attempts, which was most of our drive through the Adirondacks. That's almost six hours right there. Of just casting on. I didn't knit in NYC nearly as much as I thought I would, and the ball of 220 Superwash got really tangled in my purse and took nearly a day to untangle and re-roll.

(I did have an enjoyable subway moment, when the two young women sitting across from me in the subway car eyed me with envy as I was knitting, and then turned their conversation to dreams of what they'd like to knit someday -- if they ever actually bothered to pick up the needles. It was quite a hilarious situation, but contributed significantly to a need-t0-unknit-a-few-rows moment, which then started the oh-crap-what-a-tangled-mess phenomenon. That's what I get for gloating.)

I finally made some good progress on the red BSJ as we drove down the Garden State Parkway to DC/Baltimore. Finished it in DC, except for the sewing-the-shoulder-seams, and promptly lost it under stuff in the back seat of the car.

The second (blue) BSJ, I cast on somewhere between DC and Durham, NC, where we spent the night with some other college friends. I did much of the casting-on and knitting-up so much better the second time around... except that I accidentally cast on 155 stitches rather than 160, and didn't realize it until I was halfway through. I was NOT frogging several days worth of my work at this point (there was still one more BSJ to go, remember!), so I just reworked the math and kept going. But the extra math meant extra thinking for every row (wait, do I increase here, or do I increase there? How many stitches am I supposed to have on each side of the marker? How big should I make that middle section whose stitches I pick up later? ARGH).

I did not finish the blue BSJ by the time we got back up to DC on the homeward stretch of our journey. I didn't even finish it by the time we got back to Vermont, because I insisted on driving the whole way from Philadelphia to Burlington (at some point, my need to be in control of the car trumped my desire to finish the darn sweater). I finished the blue BSJ about ten days after we got home, because I wanted the needles so I could get started on the sleeve of the Minimalist Cardigan -- the night before I was taking off on my next trip. I finished the knitting, but not the shoulder seams, about 1 a.m. With a 6 a.m. flight the next day. Sigh.

One more BSJ to go. I kind of can't handle it right now, though, and want to finish my Minimalist Cardigan first. Looks like I'll need to knit the third (green) one on size 8s rather than on7s, and send that one to the biggest baby of the three.

BTW, on size 7s, one BSJ takes about a ball and a half of Cascade 220 Superwash. At some point, I'll likely make a stripey fourth BSJ out of the remainders. In spite of all the pressure I put on myself to do a bunch of the same sweater again and again (which could easily lead to me hating the pattern), I still adore the BSJ and will probably make a zillion more over the course of my lifetime.